Saturday, 27 October 2012

Stepping through the process sequence, 4, 5 & 6 of 18

These next 3 steps are easy in content and go quickly. BUT again attention to detail Step 4-6 !!!imageThe last 100 primers to Flip and load into Small Primer pick-up tubes (Yellow plastic tip)  I have Magnum primers so I’ll go ahead and use them. flip1Packaged 100 to the box, place on to serrated Flip Tray base. Yes there is a trick to this. Place the tray Lid on to base and flip. flip2Correct any primers that are wrong side up .. load up the tube. That’s 5 tubes 500 primers .. good enough to get started

flip3flip4flip5 

Tip: 4-6 the last 1 or 2 primers will stay inside the YELLOW pick up tip .. gently push them free into the tube. (I use a clean aerosol plastic tube) This will avoid any Flipped primers going into the press. procpri7

imageLoad a good handful of cases into the bowl. Without the feed tube installed plug the out feed end and run the feeder. With a few cases in line the Micro Switch should turn the feeder off.

imageShell plate empty pull the lever down to end of stroke.  You want a few thousands of an inch clearance between the Shell Plate and the bottom of the Re-Sizing Die (station 1)

On to step 7

No comments:

Post a Comment