Mounted and Set-Up the Vice on the Drill Press Table .. set to Drill a 0.0626" hole for mounting Piano style hinge for the Lid and Base...
Friday, 6 December 2024
Friday .. progress continues ....
Friday Ante Meridiem ..Update..
Managed to get all the Long Sides into Glue-Up yesterday .. using the parallel clamps to augment the Vices ... A base in one vice and a Lid in the other.
Thursday, 5 December 2024
Thursday Post Meridian .. progress on WIP
Work bench in orderly disarray 4 glue-ups clamped .. 4 more in queue .. all materials cut to height.
Lid in the Drill Press Vice... Base up 1/2" spacers underneath. Improved solution to keeping sides even and parallelTwo Bases and Two Lids .. next up for the SQUEEZE....
Thursday early AM ... Getting a Grip .. start of the day... UPDATE....
Nice having a "precision" method of establishing Fence Position...Blocks: Oiled and Dry...
First & Second Bases; checking prior to glue-up .. one in standard drill press 4" vice, one in a precision toolmakers 3" vice Toolmakers vice .. all very good.
Drill Press vice .. stand-offs to ensure alignment under presusre
Gule-Up #1 .. so far so good .. NOT GOOD... I RE-Glued this base.. sides not lined up with base .. parrell and square but not flat with base.. 2nd try in glue up
Glue-Up #2 setting up .. NOTE double check sides are square & parallel in the drill press vice.
Tuesday, 3 December 2024
Tuesday: Block Drilling .. 20 new blocks and Re-Drill 10 Blocks to new Dia and Depth....
"Old School .. 1970 the 1st. METRIC REVISION"... " A UK Machine Shop / Tool Room / Engineering Standard" First Metric item in our area was Lumber from the Nordic Countries..Driving carpenters crazy .. ( multiply by 2.54 or divide by 2.54)

Block 1 of 20: First Hole .. LETTER "B" Drill .. 0.238" Clamps set at Left / Right margins....
Block 1 Top Row of 5 holes done !! Pre set spacers used to position middle 3 holes.
20 new blocks Drilled ... Next; Sand and Oil Finish. The Boxes: Bases and Lids will be next.. 4 new boxes planned, Oak bases and Lids, Walnut Edging for Bases .. an interesting combination.
Monday, 2 December 2024
Monday: Part Two .. Blocks; Drilling Fixture and set-up
Managed a 21 Block yield from the Poplar board: 20+ a set-up block.
Fixture presents the 20 degree face at the Horizontal for Drilling .. Clamps and spacers line up block for drilling- note: change to Letter "B" 0.238" .004" larger in Dia. Drill to max depth .. .075" deeper. : Station #1
Station #2 .. left hand spacer used for offset
Station #3 .. Right hand double spacer used for offset
Station #4 .. Right hand spacer used for offset .. Station #5 is block against Right Hand clamp.
Sunday, 1 December 2024
Set-Up Ready to Rip Cut a WARPED Poplar board - Monday UPDATE
Out feed runners: Feather Board and Squeeze held to Fence
12" x 3/4" Poplar board: Major Warpage .. Yielded one 3" wide board. Even a 1" wide board had a Twist ..... so I have one board to make 22LR Blocks .

Wednesday, 27 November 2024
Shooting Boxes .. Wednesday .. calling this project done.. Update #4
Both boxes complete and loaded. Walnut works well and a finish of Danish Oil looks very good... 5 blocks, 10 rounds per.
Closed Box with block in the ready position
Experimental Block; made from High Density Foam ... works well weighs VERY little.....
Tuesday, 26 November 2024
Shooting Boxes .. End of-Day .. Update #3-A
Tuesday evening, Boxes fitted with Hinges and Latches; Leaving the Finish to Dry/Cure same for the 10 Insert Blocks.
Closed box with a Block in the ready position.
Shooting Boxes .. Mid-Day .. Update #3