A good size box for a Group Therapy sessionRefitted with: "Phil Miracle Foam"
Tuesday, 31 December 2024
45 ACP .. A well made cigar box with upgraded Hinges....
Saturday, 28 December 2024
9mm Luger: .. Plain Jane Cigar Box .. with upgrades .. complete.
A Plane Jane; but well made box: overall size 9" x 6.750"Upgraded with Brass LatchFitted with upgraded hinges. Foam (off cuts) Risers .. mitered corners keep them in place.Box and Insert...ready to assembleInsert inserted.9mm Luger Loaded into a 12 x 9 matrix ...108 rounds
Friday, 27 December 2024
38 Special ... very SPECIAL
Friday, 20 December 2024
Wednesday, 18 December 2024
5 new 22LR Competition Ammo Boxes (UPDATE>>>>)
Colour Samples on FOAM BLOCK ... Left to Right: Cherry Stain, Dark Walnut Stain and No Stain.
Saturday, 14 December 2024
New Boxes: 9mm.
Friday, 13 December 2024
Friday PM Wrap-Up
44 Blocks all processed through the Table saws... One saw set for 10 degree Face Cut .. Other Saw Set for Rip and Crosscut .. Also squared up the remainder of First Sheet of Foam Board .. also squared up Second Foam Board .. Set-Up Drill Press for Lower Row of 5 Holes .. Drilled one Block with all 10 Holes ...
Blocks ready for drilling Lower set of holes:Set-Up and Test Blocks; Three Poplar and Three Foam
Processing New Material .. New Blocks
Using a High Density Foam Board: Very easy to Saw and Drill. No resistance, so requires diligence. Spent Wed, evening experimenting with various Saw set-ups and process sequencing.
Set to Drill at Station #1 Top Row. Top Row: 5 Holes.Processing through 44 blocks .. 8 sets of 5 plus some spares.
Tuesday, 10 December 2024
Tuesday AM ... Wrap-Up .. Caught Up
Tuesday morning:
1) Finished up mounting Router Plate into the Table Saw Wing. This a much more stable / no flex 10mm, 0.395" thick Plate (replacing the thinner one, only 1/8", 0,125", 3.17 mm) recessed into wing.2) 22LR Boxes and Inserts complete.
Monday, 9 December 2024
Monday .. Very busy full day
Finished up the 22LR Box Build .. Finish continues to dry. 2 Boxes are being refinished .. All American Walnut boxes. 4 New Boxes a combination of Oak and Walnut, and 20 new 10 round Inserts, Poplar.
Sunday, 8 December 2024
Sunday .. PM overview
3 Lids in Last Glue-Up ... Block Stop in the lid used when box is closed 1 Box assembled to test Hinge and Latch .. great fit .. Block Stop in Glue-Up
Sunday early AM... Drying time
Boxes 1 & 2 get a 2nd coat.. boxes 3-6 drying after first coat20 new blocks are dryPutting the boxes out in the Sun; air is still cold..... probably need another day to dry.
Saturday, 7 December 2024
Saturday ... lot of set-ups and assembly / disassembly and applying finish..
Friday, 6 December 2024
Friday .. progress continues ....
Mounted and Set-Up the Vice on the Drill Press Table .. set to Drill a 0.0626" hole for mounting Piano style hinge for the Lid and Base...
Friday Ante Meridiem ..Update..
Managed to get all the Long Sides into Glue-Up yesterday .. using the parallel clamps to augment the Vices ... A base in one vice and a Lid in the other.